Got a few things done did a lot of sanding in the center section and after about three hours epoxied in the Control mount now trying to figure on routing the down cable that center section is covered in Balsa so making all the six wing ribs will support the Balsa cover. Mounting the three inch bell crank. I wired the lead out a few day ago and made the cable route thru the wing tip assembly. The kit had plastic lead outs so I had K@S copper tubing and routed the plastic cable lead outs and inserted them in the brass tubing. Now it’s all drying and will mount the bell crank and maybe do a little more sanding.AJ