RCU Forums - View Single Post - A-26 Construction Log - Building the 7th Chadwick
Old 12-15-2003 | 01:14 PM
  #67  
lslewis
Senior Member
My Feedback: (2)
 
Joined: Aug 2002
Posts: 353
Likes: 0
Received 0 Likes on 0 Posts
From: Cape Coral, FL
Default RE: Building the 7th Chadwick

OK! OK! OK!!! I consider myself severely chastised. So I bought 1/32 balsa per your instructions at the LHS. I have taken a couple pics of the nacelle to give you an idea of what is required. The hatch on the front covers the nacelle from the firewall N-1 to N-2 the LG mounting bulkhead. The remainder back to N-3 is to be planked. I want it removable for access to the LG and potentially the installation of retracts. The outside surface of the hatch must match the outside surface of the nacelle.

So how do I do this Bill? I am ready to cut balsa.

Two pics, one gives the overall nacelle, the other gives the detail dim.
Attached Thumbnails Click image for larger version

Name:	Ig11467.jpg
Views:	37
Size:	58.1 KB
ID:	82490   Click image for larger version

Name:	Vq51644.jpg
Views:	36
Size:	44.5 KB
ID:	82491