RE: RE: RE: RE: RE: Capiche 50
ooo, the fuz took me a few hours, maby 3-4. Wing has taken longer. Tail surfaces, 1 hour each to make a good job. Aileons, well one took me 3 hours! this is my first ever kit so im bound to be slow.
Ive got fiberboard as my building board. Cost me a fair bit (23 quid) for a 65" and a 30" bit at about 30" width. Its got a bend in the center of mine so i use everything to weight it don to get it out, its not the best stuff as its hard to stick pins in but it does the trick.