Sledge 540 progress.
Jeff,
Yeah its all coming together just fine. I did talk to Robert and Debbie about some small things that they need to change on their end. Mostly how they had the laser cutting machine set.
Some of the ribs TE's werent the right lenght and one end rib (1/8") wasnt flat when the laser went at it.
Am I on the list for the CF gear? I hope so because the gear in the kit wont work. The long end where the bolts mount it to the fuse is not long enough. The top end doesnt hit the hardwood engine block.
Is the CF gear longer on that end?
Pugs,
I was thinking about covering it like my 29%'er.