12 hours into the project.
There isn't much left in the kit box. Two sheets of laser cut parts, a few sticks, and the hardware.
Overall, I'm very impressed. Sig has come a long way since I built the Kadet Mk II and Kommander 18 years ago.
The tail surfaces are only sitting on the fuse right now. Pretty much all that is left is to build everything that goes on top of the fuse and install stuff such as the landing gear, pants and tail bracing. It will be ready for covering before the end of the week.
John