Well its almost time to fly the Griffin
I have a list of things to get done with it first, but the list can almost be counted on two hands now. Some of the things left to accomplish include:
-Install the ailerons and wires for them.
-Install the rudder/steering wheel servo.
-Install the rudder, elevator, and ailerons, and hinge them in place.
-Install the nose cone, speed control, and li-poly battery.
-Install receiver and antenna, and control connections.
-Balance the plane and see if i need to add any weight to make it right.
-Cover the plane and hope it turns out good lol
-Set the control throws
-Charge battery, radio, etc...
-Pack car and go to field and test fly the Griffin
Anything missing ?
-David
Wild Eagle Model Productions