How's the weather out there??? LOL (man this thread went quiet)

I have been "almost read to fly" like six times now. I keep uncovering little things to address and most surround replacing the pushrod setups. I'm on pushrod version 3.0 but think I have a good layout now. Also the detailing is an ongoing and long process, I have all of you to thank on those wickid Hellcats posted. I think I read somewhere this ARF takes 5 hours to build. (?)