RCU Forums - View Single Post - Goldberg Protege assembly
View Single Post
Old 08-26-2007 | 10:22 PM
  #18  
CGRetired's Avatar
CGRetired
My Feedback: (1)
 
Joined: Sep 2004
Posts: 8,999
Likes: 0
Received 3 Likes on 3 Posts
From: Galloway, NJ
Default RE: Goldberg Protege assembly

I put the servo's in the fuselage tonite before heading to a concert. It took me about a half hour..

Next, probably tomorrow evening, will be the horizontal stabs, vertical stab, and the landing gear. I will also put the RX switch but will wait for the engine to decide where to put the battery. By the way, I am using a Venim 5 cell 6 volt 1200 MAH NiMH battery pack.

I was telling MinnFlyer and I believe RCKen that I decided to use the new OS 75 AX. After my experience today our uncut flying field, I made 6 attempts to fly, two were successful, and I spent a lot of time walking down to the end of the runway gathering my plane because it could not get enough speed to take off. That won't happen again. The Protege will get the .75.