RCU Forums - View Single Post - m26/m46 conversion
View Single Post
Old 11-14-2007 | 02:05 PM
  #36  
swathdiver's Avatar
swathdiver
Senior Member
 
Joined: Mar 2006
Posts: 5,031
Likes: 0
Received 1 Like on 1 Post
From: Port Saint Lucie, FL
Default RE: m26/m46 arv help needed

[link=http://www.army.mil/CMH/documents/vietnam/vni/249.htm]More CEV[/link]

e. The Combat Engineer Vehicle (CEV), Company A, 65th Engineer Battalion successfully used several innovative techniques during Operation Cliff Dweller IV.

(1) The CEV devised a plan to afford more protection for US infantry elements providing security for the southernmost blocking position. When arriving at this position on 8 January the vehicle commander used the CEV blade to build a berm 3-4 feet high between the tanks to protect the infantrymen. This not only gave the infantryman a berm in front of him but also a depression behind the berm for further protection. On 11 January the CEV leveled the berm, filling in all holes after the blocking force had completed its mission and were returning to their respective bases of operation.

(2) In order to bring more destructive fires against the enemy with its 165mm demolition projector, the CEV commander took down the locations of caves during the daylight hours and fired at them at night using a range card system. Three secondary explosions were achieved by using this method. Further damage assessment to enemy personnel or equipment was undeterminable because of the destructive power of the 165mm demolition projector. It was the only weapon available during the operation capable of destroying caves of the granite type found on Nui Ba Den.