Some more photos of the Pipe dream. Engine testing on the patio and some close ups of the bomb drop mechanism.
There're 2 linkages for the bomb drop mech. The 2 straight link setup allows one bomb to be dropped at a time, using the channel 7 pot on the tranny. The Y linkage unlocks both bombs simultaneously. This is intended for use with a friend's rc drop glider. That's still in the works, but the mechanism is ready.
A FlyCamOne is also in the plans, but I'm not allowed to have that till Christmas