elevator epoxy question
Hey hipsters...
I am building a extra 300 arf.
I have to install the elevator through a slot that is built into the fuz. It is a snug fit (I like that). The question is, how do I apply epoxy to the elevator without it pushing out when I go to install it into the fuz (The elevator is allready covered). It is fitting through an oval opening, so it has to slide through. One of the things I though of was putting minimal ammounts of epoxy on the elevator to start with, once I get it in place, draw some epoxy through a straw and then "blow" as much of it as I can through what small gap there is.... any ideas?
Thanks.