ORIGINAL: mclina
ORIGINAL: Dr1Driver
If you wanted it for the weekend, you should have ordered it earlier. Or, Gawd forbid, supported your LHS by buying it from them.
Dr.1
I was thinking the same thing, but I didn't want to sound argumentative.
The other thing I was thinking, was that getting an ARF in the mail on Friday, and getting it into the air on Saturday is a bit of a rush. I know that for me, if I tried to rush something like this, I would end up with a dumb mistake and a broken plane. I haven't put together any ARFs, but I know guys who take a lot longer than a day to get them in the air.
I do hope you get your plane on time, and that you have success getting it put together quickly.
Good luck.
Very good point, take your time building your ARF. Reinforce your fire wall with epoxy, fuel proof your fire wall and inside your fuselage, use your battery to set your CG, all this takes time if you want a good fly-er. Also, I've never have a problem with Tower and there shipping, I guess I'm a lucky one.