RE: ZN Synergy with T-Canalizer
Synergy was recently tested with the new T-Can setup. Pitch coupling in left KE was not elminated still have about 15% mix but now rolls better and slower. My CG currently is at 260mm from TE.
The T-Can base was fitted on the fuselage deck with 3M fibre tape. It was flown with pretty strong winds 4-5 bft and proved to be really solid.
Regards,
Nikos