Just doesn't line up
I am building an Ultimate 40 ARF from Nitroplanes and need some more help! I need to install the throttle linkage from the carb. to the servo and there is no instructions in the manual for it. I drilled a hole through the firewall to feed the piano wire but it is in no way even close to being near the servo. The space I have is limited to work with. I put a hole just about in line from the carb. but the wire is like 1 1/2" to 2" to high at the other side. The fuel tank would be in the way if I tried to go lower or deeper inrto the fuse. Any ideas as to how I can bend up the linkage to fit? I thought that I could make a big Z bend near the servo but thought I would ask if there wasa better way to di it. Has anyone had to deal with this?