RCU Forums - View Single Post - New LEO 110 build
View Single Post
Old 11-24-2008 | 01:07 PM
  #44  
Captin1's Avatar
Captin1
Member
 
Joined: Aug 2006
Posts: 84
Likes: 0
Received 1 Like on 1 Post
From: Belle Vernon, PA
Default RE: New LEO 110 build

I was working on the fuel Tank area hold downs
I seen every body using velcro so I will also
I picked up my velcro at Lowes store for around 3 bucks so I bought 2 of them
the size is 18 in x 3/4 or 45 cm x 19 MM
I enlarged the holes in the tray area to accept the 3/4 size strip
I used a piece of 256 rod about a 1.25 inches long for the hold down rods I used the sticky back tape on itself to make the loops for the rods
I used a piece of 1/4 inch foam under the tank for vibration problems
Attached Thumbnails Click image for larger version

Name:	Ur52310.jpg
Views:	66
Size:	52.6 KB
ID:	1078211   Click image for larger version

Name:	Bw71899.jpg
Views:	65
Size:	45.8 KB
ID:	1078212   Click image for larger version

Name:	Gl20421.jpg
Views:	60
Size:	36.9 KB
ID:	1078213