RE: Vertigo II Build Thread
In my last post, I did some design work at the Cad station, laying out the plan for the aileron servo mounting and linkage. Now it's time to put the plan into action. In the first pic, I have laid out the guide lines for cutting the hole for the servo box. Then the skin is removed, and the hole for the box is cut into the core. Pic 2 show drilling the hole for routing the servo wires to the wing root. Pic 3 shows the completed cut out with the wire hole, drilled right on target.