RCU Forums - View Single Post - Vertigo II Build Thread
View Single Post
Old 03-28-2009 | 10:25 PM
  #75  
KLXMASTER14's Avatar
KLXMASTER14
 
Joined: Jun 2007
Posts: 973
Received 0 Likes on 0 Posts
From: Simi Valley, CA
Default RE: Vertigo II Build Thread

Photo 1: Gear mounts are ready for assembly. 1" sections of 1/8" dia. dowel will be epoxied through the small holes in the plate, helping to anchor the plate to the core, and distribute the gear loads deep into the core. The back sides of the blind nuts are covered with masking tape to prevent the threads from filling with epoxy.

Photo 2: The gear mounts are glued in place with 30 minute epoxy and some microballons, not thick like you would use to make a fillet, but just enough to fill any irregularities and not run out of the joint. The dowel holes are filled with 30 minute epoxy using a plastic glue syringe, then the dowels are coated with epoxy and pushed into place, the ends flush with the surface of the gear plate. After the epoxy cured, the foam was cut out using the method described in my last post.

Photo 3: The Spring-Air main gear in position.


Attached Thumbnails Click image for larger version

Name:	Ig13734.jpg
Views:	72
Size:	63.2 KB
ID:	1168255   Click image for larger version

Name:	Up48124.jpg
Views:	74
Size:	57.3 KB
ID:	1168256   Click image for larger version

Name:	Sx62845.jpg
Views:	76
Size:	61.0 KB
ID:	1168257