RE: Stinger Build Thread
Next you make sure the dowels are flush with the bottom of the wing.
Some Skin It was mixed up and 3 layers of fiberglass were added on the bottom.
These were applied in the following order: 9" wide, 6" wide, and 4" wide
Some stretch wrap was applied over the top to provide a smoother finish.