ORIGINAL: cgroen
My install so far, need to get batteries (right now it seems that I will need 3 pcs 2S/5000mA/H LiPo in the nose to get proper CG) and thrusttube installed, and the pilots should arrive in a couple of weeks

The feedline from the UAT to the pump needs to be changed to 6mm all the way (with a small piece of 4mm over the inlet of the pump)
Carsten is that a Ikea Board floor in your Viper?